Cleveland Clinic

H&R Steel detailed 7,900 tons for Cleveland Clinic’s Neurological Institute, a 1M sq. ft. hub for care and research.
Healthcare

Client

Cleveland Clinic

Date

2024

Tonnage

7,900

Location

Cleveland, Ohio

What we did

H&R Steel detailed 7,900 tons of structural steel for the Cleveland Clinic Neurological Institute Expansion in Cleveland, Ohio. As the largest building on the Main Campus, this 1 million square-foot facility is dedicated to advancing neurological care, research, and treatment for conditions affecting the brain, spine, and nervous system. Our scope included detailing, fabrication, and delivery of the steel systems required to support the facility’s vast clinical, research, and collaboration spaces.

The scale of the project demanded close coordination with architects, engineers, and contractors to meet strict medical facility standards for safety, flexibility, and performance. Structural steel was critical in creating wide spans and adaptable layouts that accommodate advanced technology. Through precise modeling, rigorous quality control, and efficient delivery, H&R Steel contributed to a landmark project strengthening Cleveland Clinic’s global reputation for innovation in neurological medicine.

"We’ve worked with H&R Steel Detailing on both small and large projects, and they’ve consistently delivered accurate, high-quality drawings on schedule. They’re well-organized, communicate clearly, and are proactive in resolving issues before they reach the field. They are a reliable and professional detailer we trust."

Kyle Fitch
Drake Williams Steel
— Our Work —

Related projects

Explore a selection of major projects where H&R Steel’s detailing and fabrication helped deliver structural precision and lasting impact.

Healthcare
Menorah Medical
Healthcare
UPMC Presbyterian Hospital Tower

Let’s get your next build detailed right

Start your next project with a detailing partner who delivers clarity, speed, and accuracy from the start.